CS615 GRAND QUIZ SOLVED 100% VERIFIED BY ADMIN (MID TERM SYLLABUS)
Q1: Software requirements engineering is a process of all except:
A) Discovery
B) Refinement
C) Design (page 92) (100% Sure)
D) Specification
Q2: The quality of software is said to be high if it meets the:
A) Standards, defined for the product
B) Procedures, defined for the product
C) Standards and Procedures, defined for the product (page 118) (100% Sure)
D) Design, defined for the product
Q3: The check-in and checkout facilities provide ________.
A) Best control
B) Component control
C) SCI control
D) Synchronization control (page 114) (100% Sure)
Q4: These all are Product Operation Factors except:
A) Reliability
B) Efficeincy
C) Testability (page 120) (100% Sure)
D) Usability
Q5: Ineffective project sponsorship by management is a :
A) Technology-related problems
B) Process-related problems
C) People related problems (page 86) (100% Sure)
D) Product-related problems
Q6: A meeting is conducted at a _______ and attended by both software engineers and customers.
A) Software engineer site
B) Neutral site (page 100) (100% Sure)
C) Customer site
D) Company site
Q7: All of the following are included in 4P's of Software Project Management EXCEPT_________.
A) Product
B) People
C) Project
D) Price (page 07) (100% Sure)
Q8: Each process is described by:
A) Input
B) Output
C) Tools and Techniques
D) All of the given options (page 131) (100% Sure)
Q9: Version control combines _______ to manage different versions of configuration objects that are created during software product management.
A) Procedure
B) Tools
C) Procedure and Tools (page 111) (100% Sure)
D) None of given
Q10: Reviews conducted at each of this phase/s _____.
A) Analysis
B) Design
C) Coding
D) All of given (page 124) (100% Sure)
Q11: Path following is the characteristic of _______.
A) Leadership
B) Management (page 45) (100% Sure)
C) Assistant manager
D) Librarian
Q12: _______ identify which quality standards are relevant to the project and determine how to satisfy them.
A) Quality planning (page 139) (100% Sure)
B) Quality assurance
C) Quality control
D) Process control
Q13: Upon evaluating current problems and desired information(input and output), the analysit begins to ________.
A) Synthesize solutions (page 94) (100% Sure)
B) Model
C) Specification
D) All of the given
Q14: These are all Product Transition Factors except:
A) Interoperability
B) Configuration
C) Expandibility
D) Maintainability (page 121) (100% Sure)
Q15: Path finding is the characteristic of _______.
A) Leadership (page 45) (100% Sure)
B) Management
C) Assistant Manager
D) Librarian
Q16: Analyze, document, validate and manage software or system requirement. Choose the best relevant phase for the mentioned tasks.
A) Software concept
B) Coding and debugging
C) Deployment
D) Requirement analysis (page67) (100% Sure)
Q17: Once the review is complete, the Software Requirement Specification is "signed-off by ______".
A) Developer
B) Customer
C) Top level Management
D) Both Customer and Developer (page 106) (100% Sure)
Q18: _______ defining that project objectives are met by monitoring and measuring progress regularly to identify variances from plan so that corrective action can be taken when necessary.
A) Initail Process
B) Planning Process
C) Executing Process
D) Controlling Process (page 131) (100% Sure)
Q19: Who energize(s) the team(s) towards goal attainment?
A) Project Manger
B) Customer care officer
C) Team Leader (page 31) (100% Sure)
D) None of the given
Q20: The Project Planning, Controlling and Tracking includes Task.
A) Detailed Project Plan (page 78) (100% Sure)
B) Scope determination
C) initial project plan
D) Requirement Gathering
Q21: ______ means developing a vision of the future and strategies for achieving that vision.
A) Management
B) Leadership (page 32) (100% Sure)
C) Stakeholders
D) Supporting staff
Q22: Evaluating overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards. Choose suitable name of this activity.
A) Project Plan Execution
B) Quality Assurance (page 139) (100% Sure)
C) Team Development
D) Information Distribution
Q23: Deployment and Maintenance will be the ______ phase of core software project life cycle.
A) First
B) Second
C) Seven
D) Last (confirm) (100% Sure)
Q24: Sofware project coding is completed in the _____ phase.
A) Coding and debugging (page 16) (100% Sure)
B) Software Concept
C) Detail Design
D) Software Requirement
Q25: These all are Product Operation Facotrs except:
A) Reliability
B) Efficiency
C) Testability (page 120) (100% Sure)
D) Integrity
Q26: ______ is the technical kernel of software engineering.
A) Design (page 107) (100% Sure)
B) Implementation
C) Testing
D) Maintenance
Q27: The final activity for a project manager is ______.
A) Project closedown (page 80) (100% Sure)
B) Project implementation
C) Project execution
D) Project quality
Q28: The overall roll of Software in a larger system is identified during:
A) Requirement Engineering
B) Process Engineering
C) System Enginnering (page 92) (100% Sure)
D) All of given
Q29: Cost & Efforts are ______ to begin with but grows ______ towards end of project.
A) Small, Larger (page 67) (100% Sure)
B) larger, small
C) small, small
D) Larger, larger
Q30: _________ is to synchronize the project activities to make the project development a success.
A) The stackholder
B) The security officer
C) The project manager (page 67) (100% Sure)
D) The Programmer