CS605 GRAND QUIZ SOLVED MID TERM FILE 1|| 100% VERIFIED|| VURANK

CS605 GRAND QUIZ SOLVED 100% VERIFIED BY ADMIN (MID TERM SYLLABUS)

Q1: Reel has defined ________ steps process to improve the chances of success.
A) 3
D) 4
A) 5 (page35) (100% Sure)
A) 8

Q2: The most common way to determine the information needed to define project scope is to:
A) perform a market analysis to determine potential customers
B) build a software prototype and show it to the customer
B) examine historical project data from similar applications
B) conduct a preliminary meeting with the customer (page80) (100% Sure)

Q3: In context of "Individual control chart", if a single metrics value lies outside UNPL, it means that:
A) The process has been matured
B) The process is not mature yet
C) Process is out of control (page77) (100% Sure)
D) Process in within control

Q4: When more than one users interpret the same requirement in different ways then we can say that the requirement is:
A) None of the given
D) Incomplete
D) Ambiguous (Confirm) (100% Sure)
D) Incorrect

Q5: In context of moving range and individual control charts, UNPL stands for:
A) Universal Natural Process Line
A) Upper Natural Process Line
D) Upper Natural Process Limit (page77) (100% Sure)
D) Upper Natural Process Line

Q6: A PM has to first come up with the schedule and then monitor the _______ of the project to ensure that things are happening according to the schedule. It would not be out of place to quote Fred Brooks at this point He says, "Project fall behind schedule ________ at a time."
A) Schedule, Two day
A) Schedule, Two day
A) Progress, Three day
D) Progress, One day

Q7: Control charts are the following two types:
A) Moving range control charts and individual control charts (page75) (100% Sure)
D) Moving range control charts and statical control charts
D) Individual control charts and statical control charts
D) None of the given options

Q8: In the context of statistical models, COCOMO stands for:
A) Computer Company Model
A) Commutative Conduct Model
A) Constructive Cost Model
D) Conductive Cold Model

Q9: In ________ team organization, there is no permanent leader rather there are task coordinators.
C) Control Decentralized
D) Democratic Decentralized (page32) (100% Sure)
D) Controlled Centralized
D) Synchronous Paradigm

Q10: Software Product management primarily deals with metrics related to productivity and ________.
A) Quality (page65) (100% Sure)
B) Efficency
B) Reliability
B) Compatibility

Q11: FAST is a team-oriented approach to requirement gathering, the term FAST stands for:
A) Fast Application Security Technique
B) Facilitated Application Specification Techniques (page80) (100% Sure)
C) Fast Associated Special Task
D) Field Applied Science Technique

Q12: Risk Analysis and management involves addressing the following concerns except:
A) What does do we have for each risk
B) What can happen if the web interface of the company's website will change (page84) (100% Sure)
C) What change might cause the risk to strike
D) What thing may go wrong in future

Q13: The extent to which a program satisfies its specifications and fulfills the customer's mission objectives is _______.
A) Integrity
B) Reliability
C) Correctness (page67) (100% Sure)
D) None fo given

Q14: A _______ provides a quantitative value of some attribute of a proecess or a product.
A) Metric
B) Measure (page65) (100% Sure)
C) Function point
D) Plan

Q15: If a software developer is going to develop software for a nuclear reactor which factor(s) will be more important?
A) cost effectiveness
B) performance
C) reliability
D) both performance and reliability (page6) (100% Sure)

Q16: Requirements ar sometimes fill with defects, normally known as _______ requirements.
A) Functional requirements
B) Non-functional requirements
C) Toxic requirements (Confirm) (100% Sure)
D) System requirements

Q17: _______ technique was initially developed for manufacturing processes in the 1920's by walter Shewart.
A) Upper Control line
B) Control chart (page75) (100% Sure)
C) CMP
D) Quality

Q18: Every project has a defined number of staff memebers. As time allocation occurs, the project manager must ensure that no more than the allocated number of _______ has been scheduled at any given time
A) Task
B) People (page93) (100% Sure)
C) Days
D) None of the given

Q19: Effective software project management focusses on the four P's. These are:
A) People, Product, Process, Problem
B) People, Product, Process, Project (page29) (100% Sure)
C) People, Passion, Process, Project
D) People, Passion, Planning, Project

Q20: Which of the following is not a software metric?
A) Defects per function point
B) No. of test cases per function point
C) No. of defects (page66) (100% Sure)
D) None of the mentioned

Q21: ________ is fundamental for providing mechanisms for objective evaluation of any process or activity.
A) Metrics
D) Measurement (page65) (100% Sure)
D) Indicators
D) Pointers

Q22: ________ help in finding the matrix to be stable or unstable.
A) Control chart (page75) (100% Sure)
B) Directed Graph
B) Cyclic chart
B) Base Line Graph

Q23: Which of the following is a software measure.
A) No. of test cases per function point
B) No. of defects (page65) (100% Sure)
B) Defects per function point
B) None of the mentioned

Q24: ________ is an Object Oriented Model
A) Spiral
B) Water Fall
B) Incremental
B) Fountain (page23) (100% Sure)

Q25: Which of the following is/are considered as resources for an Organizatoin.
A) Hardware/Software Tools
B) Reusable software components
B) People
B) All of the mentioned (page81) (100% Sure)

Q26: We need to employ some statistical techniques and plot the results ______. These are known as statistical control techniques.
A) Graphically (page74) (100% Sure)
B) Automatically
B) Manually
B) Personaly

Q27: The primary difference between an internal logical file and an external interface file is that ________.
A) ILF
B) RET
B) DET
B) EIF (page42) (100% Sure)

Q28: _______ give you a better insight into the state of the process or product.
A) Exceptions
B) Metrics (page66) (100% Sure)
B) Errors
B) Threats

Q29: In ______ model the product is developed without any proper design and specifications.
A) Water fall
B) Build and Fix (page15) (100% Sure)
B) Prototyping
B) None of the above

Q30: _______ is the ability to encourage technical people to produce to their best.
A) Improvement
B) Motivation (page30) (100% Sure)
B) Innovation
B) Creation

No comments: